![]() Preparing the site. ![]() Gravel installed and spread and vertical posts installed. ![]() Posts are aligned and horizontal beams measured and cut to length. ![]() Leveling and bolting the beams into position. ![]() Rafters installed between beams and secured as basis for the roof. ![]() 2X2 ties installed above the rafters to hold them securely while roof is installed. Play Pause |